A River Runs through It
The new stadium under construction for the New England Patriots is architecturally and structurally unique, but it is also attracting attention for another reason: the restoration of a...

Supercharged
The Groundwater Replenishment (GWR) System is a regional water supply project sponsored jointly by the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD)....

Evaluation of the Geo-Con Vert Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center This report describes a HITEC evaluation designed...

Evaluation of the Inter-Lok Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Control of Microorganisms in Drinking Water
Prepared by the Water Supply Engineering Technical Committee of the Infrastructure Council of the Environmental and Water Resources Institute of ASCE. ...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Larger Foraminifers as Contributors to Carbonate Beach Sands
Larger foraminifers are locally significant contributors to tropical carbonate sediments, particularly in the Indo-Pacific region. The two major factors influencing foraminiferal production...

Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...

Settling Down
Engineers in Florida will prepare the sandy foundation of a future power plant by preloading it with sand for as long as a year....

Improving the Process
By revamping its solids treatment system, the wastewater utility in Louisville, Kentucky, eliminated odors, created a potential source of new revenue, and saved millions of dollars in...

Clean Water at the Crossroads
Thirty years after the passage of the Clean Water Act, the quality of effluent from the nation's wastewater treatment plants has improved considerably. However, much of the...

Saving Saluda
One of the largest roller-compacted-concrete berms in the United States will stand sentinel in case South Carolina's Saluda Dam undergoes liquifaction in response to strong...

Rapid Delivery
Facing nearly dry wells and a moratorium on development that was about to expire, a small town in the pacific Northwest, using the design/build delivery method, was able to quickly design...

Natural Progression
Engineers made storm-water detention, wetlands mitigation, and environmental safeguarding part and parcel of an industrial expansion project. Designers have created an inviting front yard...

A History of Progress
Selected U.S. Papers in Geotechnical Engineering
Sponsored by the Geo-Institute of ASCE This collection of 78 historical papers provides a wide view of the rich body of literature that documents the...

Environmental Technology Verification Report for the Plasma Enhanced Melter
Prepared by the Environmental Technology Evaluation Center (EvTEC), a service center of CERF/IIEC. This Technology Verification report describes the...

Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...

 

 

 

 

Return to search